Project
Location: Pueblo, CO
Description
of Work: 5 miles of large diameter welded
steel pipe (66", 78", 84") connecting
the Pueblo Dam and running across and adjacent
to the Arkansas River to the Whitlock Water
Treatment Plant.
Owner:
Pueblo Board of Water Works
Engineer:
Black and Veatch Corp.
|