PORTFOLIO: Sewer


PROJECT: Clear Springs Ranch Sludge Pipeline

Project Location: Fountain, CO

Description of Work: Approximately 27,000 lineal feet of 14" fiberglass reinforced pipe installed in East Las Vegas Street, adjacent to Highway 85/87 and Carson Blvd., from Sand Creek to Fountain Creek. Includes air vac/drain vaults and 3 bridge aerial crossings.

Owner: Colorado Springs Utilities

Engineer: CH2MHill




PROJECT: Sand Creek Force Main

Project Location: Colorado Springs, CO

Description of Work: 4 miles of 36" HDPE installed from Las Vegas Street waste water treatment plant to the Sand Creek lift station. The project was installed in the East Las Vegas Street corridor which required intense traffic control.

Owner: Colorado Springs Utilities

Engineer: MWH

 



PROJECT: Waste Water System Improvements
Project Location: Lake Havasu City, AZ

Description of Work: Installation of approximately 8 miles of new sanitary sewer main. Abandonment of 557 septic tanks that were replaced with gravity sewer services to the new main. A total of 23 new lift stations. All in paved streets with traffic access.

Owner: Lake Havasu City

Engineer: Burns and McDonnell



LAST PORTFOLIO:
WATER
BACK TO MAIN
PORTFOLIO PAGE
NEXT PORTFOLIO:
STORM SEWER

Contact Us

Pate Construction Co, Inc.
87 N. Mission Drive
Pueblo, CO 81007
Phone: 719-647-0463
info@pateconstruction.net


Home | Company | Services | Portfolio
Copyright © 2006-2007 Pate Construction Co., Inc.
Web Site Design by Chameleon Web Design